Illustrative stock image: Bryan White / Unsplash. WordPress may crop or resize the image for display.
West Island
Dorval still lists a preventive boil-water advisory for Herron Road between Caledonia Avenue and 1270 Herron Road after hydrant replacement work.
Sep 25, 2026 / 1 min read
Illustrative stock photo of financial-report materials: Jakub Żerdzicki via Unsplash, under the Unsplash License. Resized; not Dorval’s report.
West Island
Dorval reported a $17.9-million operating surplus for 2025 as revenue rose and capital spending reached $16.2 million.
Sep 24, 2026 / 1 min read
Illustrative file photo of a Montréal street closure: Carl Campbell via Unsplash, under the Unsplash License. Resized; not Donegani Avenue.
West Island
Pointe-Claire has extended the closure of Donegani Avenue between King and Queen avenues until 4 p.m. Thursday.
Sep 24, 2026 / 1 min read
Illustrative file photo of a Montréal roadway at night: Tamás Szabó via Unsplash, under the Unsplash License. Resized; not the Highway 13–520 work zone.
West Island
Nightly closures on Highway 13 at Highway 520 will run from September 28 to November 2, with signed detours and a pedestrian shuttle.
Sep 24, 2026 / 1 min read
Illustrative file photo of a Québec highway at night: Marc Bauduin via Unsplash, under the Unsplash License. Resized; not the Senneville closure.
West Island
Highway 40 westbound will close near Senneville from 10:30 p.m. Thursday to 5:30 a.m. Friday for pavement marking.
Sep 24, 2026 / 1 min read
Illustrative stock photo: Patrick Robert Doyle via Unsplash, under the Unsplash License. Resized; not a photograph of the Pierrefonds–Roxboro aquatic complex.
West Island
Montréal has inaugurated the $73.5-million Pierrefonds–Roxboro aquatic complex, but only says free public swimming will begin later this autumn.
Sep 23, 2026 / 1 min read
Illustrative stock photo of a neighbourhood playground; not Parc d’Athènes. Photo: Power Lai / Unsplash. Resized to 1600 pixels wide.
West Island
Pointe-Claire will hold a free inauguration for Parc d’Athènes on Saturday, September 26, with a rain date the following day.
Sep 21, 2026 / 1 min read
A public meeting chamber. Illustrative stock photo; not the Dorval consultation venue. Photo: Michael D Beckwith / Unsplash.
West Island
Dorval has postponed a public consultation on draft zoning by-law RCM-60A-24 from September 21 to October 19.
Sep 17, 2026 / 1 min read
Illustrative file photo of a Québec community; not Pointe-Claire or any project described in this article. Photo: Katherine St-Pierre / Unsplash. Cropped to 1600×900.
West Island
Pointe-Claire’s 2027 capital plan includes drainage, park, overpass, road and municipal-facility work.
Sep 15, 2026 / 1 min read
A fire hydrant beside a residential street. Illustrative stock photo; not a Kirkland hydrant. Photo: Justin Meckes / Unsplash.
West Island
Overnight fire-hydrant inspections in Kirkland’s Sector 4 run from 11:30 p.m. to 7:30 a.m. through Wednesday.
Sep 14, 2026 / 1 min read
An almost-empty parking lot. Illustrative stock photo; not the Tulip–Dawson lot in Dorval. Photo: Mick Haupt / Unsplash.
West Island
Electrical work will close part of the municipal parking lot at Tulip and Dawson avenues from Monday through Wednesday.
Sep 14, 2026 / 1 min read
A suburban green space with mature trees and a walking path. Illustrative stock photo; not a Dollard-des-Ormeaux park. Photo: James Read / Unsplash.
West Island
Dollard-des-Ormeaux says it has 34 parks and plans more than 1,000 trees and shrubs through its 2026 greening projects.
Sep 14, 2026 / 1 min read