Work begins on new Baldwin Park pool, opening planned for 2028
Le Plateau-Mont-Royal has started construction on a new 50-metre pool and wading pool at Baldwin Park, with opening planned for spring 2028.

Construction has begun on a new outdoor aquatic complex at Parc Baldwin in Le Plateau-Mont-Royal, with the pool scheduled to open in spring 2028.
The project includes a 50-metre pool with swimming lanes and a beach-style entry, a wading pool measuring more than 20 metres, water-play features, shaded areas and a universally accessible bathhouse.
Separate work on playgrounds, a splash pad and sports areas in the southern and northern portions of the park is expected to be completed in summer 2027. The borough identified Limoges as the contractor for the pool project.
Source: Ville de Montréal construction announcement, published October 14, 2026.
Featured image: Illustrative stock photo of an outdoor swimming pool and ladder, not the reported site or event. Photo by Artem Kniaz on Unsplash; cropped and resized by West Island Blog.
AI-assisted news brief. Sources are linked above.
How we work