Skip to content
Montréal, Québec · Canada
West IslandBlog.

Canada in focus.
The West Island at heart.

West Island

Pointe-Claire A40 service-road restrictions run November 23 to December 18

Westbound service-road lanes and ramps near Saint-Jean Boulevard will be restricted in stages from November 23 to December 18, while business access is maintained.

A road roller paving asphalt beside an orange traffic cone; illustrative stock image
Illustrative road paving. Photo by Michael Evans via Unsplash, under the Unsplash Licence. Not the reported A40 work; WordPress resized the original.

Drivers using the westbound service road of Autoroute Félix-Leclerc (A40) in Pointe-Claire should expect lane and ramp restrictions from Monday, November 23, through Friday, December 18.

The City of Pointe-Claire says work will affect the right lane between Bancroft/Tecumseh avenues, Deacon Avenue and the entrance ramp from Saint-Jean Boulevard southbound. Entrance ramps from Saint-Jean Boulevard in both directions are also included in the advisory.

The restrictions are scheduled, not a full closure. The city says access to businesses along the service road will be maintained throughout the work. Motorists should allow extra time near the Saint-Jean interchange and follow temporary signs and directions from crews.

The advisory does not provide a daily work schedule, so conditions may vary during the November 23–December 18 period. Drivers can consult the city’s alert for changes before travelling.

Source: City of Pointe-Claire, traffic advisory, published November 20, 2026.

Image: A road roller working beside a traffic cone. Photo by Michael Evans via Unsplash, under the Unsplash Licence. Illustrative stock image; not a photograph of the reported event. WordPress may resize the original.

AI-assisted news brief. Sources are linked above.

How we work