Skip to content
Montréal, Québec · Canada
West IslandBlog.

Canada in focus.
The West Island at heart.

Montréal & Québec

Choisy Street water shutoff and road closure set for November 20

Aqueduct work will close Choisy Street to traffic and interrupt water service on part of the street in Saint-Léonard on November 20.

Road construction crew and closure equipment, illustrative image for aqueduct work
Illustrative stock image; not a photograph of the Choisy Street work. Photo by Erik Esly / Unsplash (Unsplash Licence). Resized by WordPress.

Aqueduct work will close Choisy Street between Bélanger Street and d’Avila Street in Saint-Léonard on Friday, November 20, from 7 a.m. to 4 p.m.

A related water interruption is scheduled from 8 a.m. to 4 p.m. on Choisy Street between Bélanger Street and Saint-Zotique Street. The water-service area is therefore longer than the traffic-closure segment.

How to prepare

  • Residents and businesses in the affected water-service area can store enough tap water for essential use before 8 a.m.
  • Drivers should follow posted detours around the closed block.
  • Water may appear discoloured when service returns; follow any instructions issued by the borough.

The City lists the work window as November 20. Conditions on site can affect the exact restoration time.

Sources: City of Montréal traffic notice and water-interruption notice, both published November 18, 2026.

Illustrative stock photo; not a photograph of the Choisy Street work. Photo by Erik Esly on Unsplash under the Unsplash Licence. Resized by WordPress.

AI-assisted news brief. Sources are linked above.

How we work