Skip to content
Montréal, Québec · Canada
West IslandBlog.

Canada in focus.
The West Island at heart.

West Island

Pointe-Claire drilling planned at Terra-Cotta park November 23–27

Pointe-Claire says soil-sampling work will take place near Coolbreeze Avenue from November 23 to 27, with no traffic obstruction expected.

A broad grassed park with scattered trees under a cloudy sky; illustrative stock image
Illustrative park landscape. Photo by Dan Tuykavin via Unsplash, under the Unsplash Licence. Not Terra-Cotta Natural Park; WordPress resized the original.

Pointe-Claire will carry out drilling in Terra-Cotta Natural Park near Coolbreeze Avenue from November 23 to 27 to collect and study soil samples.

The City says specialized machinery will be set up on grassed areas. It does not expect the work to obstruct traffic.

What the work is for

The drilling will remove samples so the municipality can analyse the soil’s composition and better understand conditions at the site. The notice does not announce construction or a traffic closure.

Source: City of Pointe-Claire notice, published November 19, 2026.

Featured image: an illustrative park landscape, not Terra-Cotta Natural Park. Photo by Dan Tuykavin on Unsplash, used under the Unsplash Licence. WordPress may resize the original.

AI-assisted news brief. Sources are linked above.

How we work