Skip to content
Montréal, Québec · Canada
West IslandBlog.

Canada in focus.
The West Island at heart.

West Island

Pointe-Claire extends eastbound Brunswick Boulevard work through November 19

Pointe-Claire has extended work affecting two eastbound Brunswick Boulevard lanes between Du Syrah Street and Auto Plaza Avenue through November 19.

Orange construction signs and barrels on a Montréal street
Illustrative stock photo: Montréal roadwork scene. Medad Media / Unsplash (Unsplash License). Not the Brunswick Boulevard work zone. Cropped and resized.

Update — November 19, 2026: Pointe-Claire has extended work affecting the two right eastbound lanes of Brunswick Boulevard between Du Syrah Street and Auto Plaza Avenue through Thursday, November 19.

The City says the lane disruptions remain in place from 7 a.m. to 5 p.m. The sidewalk in the work area is also closed during those hours.

Drivers using the commercial stretch near Auto Plaza should allow extra time, slow down near the work zone and follow posted signs. The notice describes lane and sidewalk restrictions rather than a full closure of Brunswick Boulevard.

The work was initially scheduled for November 9 to 13. The City published its extension notice on November 18, 2026. Residents with questions can contact Pointe-Claire’s Engineering Department at 514-630-1208.

Illustrative stock photo: a Montréal roadwork scene photographed by Medad Media, via Unsplash under the Unsplash Licence. It does not depict this Brunswick Boulevard work zone.

AI-assisted news brief. Sources are linked above.

How we work